澳门新葡3522最新网站

Xi Jinping Surveyed Preparatory Work of the Beijing Olympic Winter Games, and Beijing Crystal Digital Technology Co., Ltd Successfully Fulfilled Digital Sand Table Demonstration Task
2017-02-27

On February 23-24, 2017, Xi Jinping (General Secretary of the CPC Central Committee) surveyed urban planning and construction and preparatory work for the Beijing Olympic Winter Games, who was accompanied by Zhang Gaoli (Deputy Prime Minister), Guo Jinlong (Secretary of the CPC Beijing Municipal Committee) and Cai Qi (Mayor of Beijing City). On February 24, General Secretary Xi Jinping surveyed Beijing Wukesong Culture & Sports Center and other places.

Beijing Wukesong Culture & Sports Center will be ice hockey venue of the Beijing Olympic Winter Games. For this showcasing event, Beijing Crystal Digital Technology Co., Ltd (a subsidiary of Beijing Beiao Group) designed and made on-site erection of entrance hall and exhibition hall, upgraded and enhanced stability screen multimedia laser pen interactive system. The physical sand table was made by means of 3D printing technology, which can be updated and remolded in a timely manner.

This showcasing event featured pressed time and heavy workload. Technical team of Beijing Crystal Digital Technology Co., Ltd worked overtime and went all out. Wu Xiaonan (Vice President of BSAM) inspected the progress on the site, offered guiding opinions, and ensure the successful completion of this reception task.

XML 地图 | Sitemap 地图